Close Menu
Entebbe News
    Facebook X (Twitter) Instagram
    Entebbe NewsEntebbe News
    Facebook X (Twitter) Instagram
    • Home
    • Politics
    • Reviews
    • Sports
    • Tech
    • Travel
    • Business
    • Entertainment
    • Events
    • Gossip
    • Relationships
    • Advertise
    Entebbe News
    Home»Business»New CAA Board Inspects Entebbe Airport Expansion Projects.
    Business

    New CAA Board Inspects Entebbe Airport Expansion Projects.

    ANGECIESBy ANGECIESJune 30, 2017Updated:July 1, 2017No Comments3 Mins Read
    Facebook Twitter WhatsApp Telegram LinkedIn Email
    One of the Consultants on the works project shares a moment with the Board Members.
    One of the Consultants on the works project shares a moment with the Board Members.
    Share
    Facebook Twitter WhatsApp LinkedIn Email Telegram

     

    The Board members were guided by the CAA Director Airports Mr. John Kagoro during the inspection.
    The Board members were guided by the CAA Director Airports Mr. John Kagoro during the inspection.

    The newly inaugurated Civil Aviation Authority (CAA) Board has commended Civil Aviation Authority management for the speedy and time bound expansion projects at Entebbe International Airport. While inspecting the ongoing works on the upgrade and expansion of the Passenger and cargo terminal on Thursday, board members who included Dr. Asiimwe Rwekikiga, Hajji Zubair Musoke Musaayi, Mrs Olive Lumonya, Eng. Mackenzie Ogweng and Enock Rukidi were satisfied with the speedy progress and the level of transparency and accountability that CAA Management has exhibited. The board members promised to continue working with CAA Management to ensure that Entebbe International Airport meets standards of other International Airports.

    Some of the projects that CAA is undertaking include;

    • Establishment of a new cargo centre complex (10,000m2, capacity of 100,000 tons),
    • Construction of a New Passenger Terminal Complex (20,000m2)
    • Strengthening of existing Apron 4,
    • Strengthening of existing Runway 17/35 and its associated taxiways,
    • Strengthening of existing Runway 12/30 and its associated taxiways,
    • Expansion and strengthening of Apron 1 (Expansion of 6 code C parking stands),
    • Rehabilitation of Apron 2, On-site water supply system.  Fire water system (excluding works on Aprons) and its associated facilities.
    A consultant from the Dar Al-Handash Shair and Partners shares a moment with a board member during the inspection.
    A consultant from the Dar Al-Handash Shair and Partners shares a moment with a board member during the inspection.

    The new Cargo Centre, which is part of the works under the supervision of the consultants commenced smoothly in May, 2016 at Entebbe. Earthworks have been completed and the contractor is now working on the airside and landside access roads.

    free unlimited internet installation uganda by black knight africa

    Cargo volumes have grown from 6,600 metric tons recorded in 1991 to 59,000 tons at the turn of 2016. The new 100,000 tones capacity Cargo Centre will be a self-contained facility with a Parking Apron, landslide and airside access roads, cooling facilities, a Freight Forwarders Parlor and ancillary business outlets.  It is part of the US Dollars 200 million loan to Uganda by China through the Exim Bank of China. Part of the loan will be used to re-surface the Runways, Taxiways and strengthen and expand the Aprons under the same contractor.

    CAA Board members in a van inspecting some of the ongoing works at Entebbe Airport.
    CAA Board members in a van inspecting some of the ongoing works at Entebbe Airport.

    At the commencement of the Cargo Centre construction, 42 new Aviation Police Units were constructed in Kigungu to relocate Aviation Police from the Cargo Centre site. They have already occupied the new state-of-the-art premises.

     

     

     

     

     

    Digital Marketing Agency - Host256
    Digital Marketing Agency - Host256
    Airport. Board CAA Entebbe Expansion Inspects new Projects.
    Share. Facebook Twitter WhatsApp Telegram Email LinkedIn
    ANGECIES
    • Website

    Related Posts

    Why USD 100 oil isn’t the economy-killer it used to be

    April 12, 2026

    Women Entrepreneurs Urged to Apply for 2026 Women in Tech Accelerator Program

    April 9, 2026

    Formula 1® and Standard Chartered announce Official Partnership

    January 27, 2026
    Leave A Reply Cancel Reply

    You must be logged in to post a comment.

    Entebbe News
    Facebook X (Twitter) Instagram WhatsApp
    © 2026 Entebbe News.

    Type above and press Enter to search. Press Esc to cancel.