Close Menu
Entebbe News
    Facebook X (Twitter) Instagram
    Entebbe NewsEntebbe News
    Facebook X (Twitter) Instagram
    • Home
    • Politics
    • Reviews
    • Sports
    • Tech
    • Travel
    • Business
    • Entertainment
    • Events
    • Gossip
    • Relationships
    • Advertise
    Entebbe News
    Home»News»Gov’t to construct new Pakwach bridge
    News

    Gov’t to construct new Pakwach bridge

    Entebbe NewsBy Entebbe NewsApril 22, 2023No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram LinkedIn Email
    Share
    Facebook Twitter WhatsApp LinkedIn Email Telegram


    Gen. Edward Katumba Wamala, the Minister of Works and Transport, said that the government is going to redesign the Pakwach Bridge to address the challenge of floods.

    Pakwach, Uganda | ENTEBBENEWS.NET | The government is to construct a new bridge on Albert Nile in Pakwach district to tackle persistent floods.

    The proposed new bridge will replace the current Pakwach bridge which was built in the 1960s to connect the railway to the West Nile region. The bridge has since developed several cracks.

    Gen. Edward Katumba Wamala, the Minister of Works and Transport, said that the government is going to redesign the Pakwach Bridge to address the challenge of floods near the bridge that often cuts off traffic along the Olwiyo—Pakwach road.

    free unlimited internet installation uganda by black knight africa

    According to Katumba, the construction of a new bridge at Pakwach is already in their plan, and will embark on the project once they secure funds.

    Over the past four years, heavy flooding of River Tangi near Pakwach Bridge often cuts off traffic flow along the Karuma-Olwiyo-Pakwach highway affecting the road intersection just 500 meters after the Pakwach bridge in Nwoya district.

    The latest incident happened in November last year, where several vehicles heading to Kampala and those from Karuma heading to Pakwach were cut off by floods from river Tangi near the Pakwach bridge.

    During a visit to Pakwach in September last year, the Uganda National Roads Authority Executive Director Allen Kagina said that their engineers had assessed three options which among others included redesigning the current Pakwach bridge to address the ever-flooding area near the bride.

    “We have so far assessed three options and those options are going to be assessed by engineers and they will tell us which option is the best”, she noted.

    Robert Omito Steen, the Pakwach LCV Chairperson explained that the construction of a new bridge at Pakwach is long overdue since the current bridge which was built during colonial times has outlived its usefulness nearly ten years ago.

    *****

    URN

    Share on:

    WhatsApp

    The post Gov’t to construct new Pakwach bridge appeared first on The Independent Uganda:.

    Digital Marketing Agency - Host256
    Digital Marketing Agency - Host256
    Share. Facebook Twitter WhatsApp Telegram Email LinkedIn
    Entebbe News
    • Website
    • Facebook

    Related Posts

    Government suspends concerts in high-risk border districts

    November 21, 2026

    Uganda becomes final country to ratify African maritime transport charter

    November 21, 2026

    Government struggles to meet demand for HIV prevention injection

    November 20, 2026
    Leave A Reply Cancel Reply

    You must be logged in to post a comment.

    Entebbe News
    Facebook X (Twitter) Instagram WhatsApp
    © 2026 Entebbe News.

    Type above and press Enter to search. Press Esc to cancel.